|
Query name |
Sequential File with Omit Last NewLine |
|---|---|
|
Server Asset Type |
Sequential File stage |
|
Analysis Type |
Remediation |
|
Description |
Checks if a Sequential file stage in a Server job has an input link where "Omit Last New-Line" has been set. |
Issue
The DataStage Parallel Engine does not support this capability.
Actions
If the now-present last new line produces a material effect upon downstream job operation, either update downstream jobs to accept it, or remove it by way of a post-job routine or script.